亚洲福利视频-亚洲福利色视频在线看-亚洲福利秒拍一区二区-亚洲福利精品一区二区三区-亚洲福利精品一区二区-亚洲福利精品电影在线观看

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 15155

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 人妻少妇精品| 2024国内精品久久久久精k8| 亚洲AV在线一区二区三区| 欧美日韩免费不卡| 黑人狂躁日本妞无码A片| 高潮无遮挡成人A片| 亚洲午夜精品一区二区三区| 人妻互换精品一区二区| 精品国产A∨无码一区二区三区| 国产av剧情丝袜秘书| 国产成人片无码视频在线观看 | 女人让男人捅30分钟| 国产亚洲日韩欧美在线| 不卡无线在线丰满影院又粗又| 亚洲精品成人片在线观看精品字幕| 欧美国产亚洲卡通综合| 国产图片一区| AV无码偷拍在线观看| 天堂8在线天堂资源在线| 久久久久久精品免费无码| 国产娇妻无码在线一区| 自拍日韩葡萄影院在线观看视频下载| 日本无码色情三级播放| 精品国产乱子宅男伦一区二区三区| 国产亚洲成AV人片在线观黄桃| 波多野结衣在线网址| 香蕉AV亚洲精品一区二区| 久久女同一区二区免费av| 国产精品精品自在| 中文字幕国产精品| 日韩人妻不卡一区二区三| 久久久久婷婷国产综合青草| 国产精品哺乳在线看还在哺乳| 2024国产麻豆剧传媒鱿鱼游戏 | 一区二区三区精品道| 欧美日韩一二三区高在线| 国产午夜精品一区二区三区不| av天堂东京| 日日夜夜久久嫩草| 久久久久久国产精品免费无码| 国产成人精品女人久久久国产suv精品一区二区三区 |